The high efficiency crusher is mainly composed of the main machine, fan, separator, powder collector, dust collector and other parts, and the main machine is divided into three parts...
1.5 to 3 tons per hour.
10%-50% water.
2 production lines.
20-35 days.
Manufacturer.